Medical Construction Cirrus Construction has been fortunate to penetrate the medical industry and add a wealth of experience to our portfolio. Projects have included new construction, as well as renovations to existing facilities.
|
Who:
|
Moses Cone Hospital |
What: |
Temporary loading dock |
Where: |
Greensboro, NC |
When: |
2010 |
Why: |
The hospital's old North tower had to be demolished before
the new tower could be constructed in its place. Cirrus
Construction was asked to build a temporary loading dock so that
daily deliveries and shipments could continue which were
vital to the hospital's operation.
|
Who:
|
Morehead Memorial Hospital |
What: |
Built a room to accommodate a new washing system for the operating room. Removed the existing equipment and installed the new. |
Where: |
Eden, NC |
When: |
2011 |
Why: |
The hospital needed to update their washing equipment and process. The new system enables staff to send in used surgical instruments to the washing unit, which then sends them out into a sterile, cleanroom environment. |
Who: |
Thomasville OB/GYN Associates, P.A |
Where: |
Thomasville, NC |
When: |
October, 2008 |
What: |
Cirrus renovated the existing office space and built an addition to the facility. |
Who: |
Morehead Memorial Hospital |
Where: |
Eden NC |
When: |
Summer, 2006 |
What: |
Cirrus Construction was asked to build a canopy over the entrance to the lithotripsy unit in keeping with the original design and construction of the building. |
Why: |
Patients needed protection from the elements when being transported in and out of the treatment area. |
Who:
|
Guilford County Emergency Medical Services |
What: |
A new EMS station was needed in eastern Guilford County. |
Where: |
Whitsett, NC |
When: |
2009 |
Why: |
The increase in population warranted an additional facility. |
Who:
|
Ridgeway Emergency Medical Services |
What: |
Cirrus Construction was asked to make necessary interior repairs and renovations due to a flooding incident. We renovated the basement area including the bathrooms, kitchen, mechanical room and large meeting room. We also repaired the exterior wall studs and replaced insulation, drywall, doors and flooring, both upstairs and downstairs. |
Where: |
Ridgeway, VA |
When: |
Spring/Summer 2014 |
Why: |
building was flooded due to faulty waterproofing. The owners re-waterproofed the complete facility before we began our work to replace the damaged areas. |
Special mention: |
In addition to the insurance claim which helped pay for repairs, the balance needed was collected in donations and through fundraisers for this volunteer EMS. All personnel are volunteers and work full-time jobs elsewhere. |
|